Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Road repair and patching to include removal and replacement of distress pavement areas, sub-grade repair, edge repair, tree root removal, overlaying and pavement marking on seven roads.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes preparation of road right-of-way including grading and removal of any foreign or deleterious material from the limits of paving, preparation of subgrade to plan grade and specifications, installation of base material to plan grade and specifications, placement of asphalt surface course to plan grade and specifications, construction of stabilized shoulders, restoration and fine grading of right-of-way outside of paved areas, sodding of all disturbed areas outside the roadway footprint, installation of temporary and permanent traffic striping. Maintenance of vehicular traffic (ttc/mot), maintenance of pedestrian traffic, erosion control and other incidental work necessary to complete the project. See outside link.
Posted Date
Dec 10, 2025
Due Date
Jan 21, 2026
Release: Dec 10, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 21, 2026
Work includes preparation of road right-of-way including grading and removal of any foreign or deleterious material from the limits of paving, preparation of subgrade to plan grade and specifications, installation of base material to plan grade and specifications, placement of asphalt surface course to plan grade and specifications, construction of stabilized shoulders, restoration and fine grading of right-of-way outside of paved areas, sodding of all disturbed areas outside the roadway footprint, installation of temporary and permanent traffic striping. Maintenance of vehicular traffic (ttc/mot), maintenance of pedestrian traffic, erosion control and other incidental work necessary to complete the project. See outside link.
AvailableRoad Resurfacing (Milling & Paving – District 2).
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Road Resurfacing (Milling & Paving – District 2).
AvailableRoad Resurfacing (Milling & Paving – District 3).
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Road Resurfacing (Milling & Paving – District 3).
AvailableRoad Resurfacing (Milling & Paving – District 1).
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Road Resurfacing (Milling & Paving – District 1).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →