Summary
Specific tasks include: i. Check for tightness of electrical connections ii. If applicable, internal tube brushing/cleaning and visual tube inspection of the heat exchanger water-side tubes are to be performed. Tube brushing/cleaning and inspection includes the heat exchanger head removal and replacement. Iii. Oil, refrigerant: if applicable, fluid analysis (refrigerant) will be provided as indicated on the service agreement. After the completion of each analysis the vendor will interpret the results and provide a written report to the forsyth county including any recommendations for corrective action(s). If the recommended corrective action(s) are within the scope of service of this agreement, the vendor will schedule and complete such action(s). Iv. Leak test refrigerant system v. All water-cooled chillers will require a tube cleaning and fluid analysis except the multi-stack they will be fluid analysis only.