Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of Construction services for the Antioch Water Treatment Plant (WTP) Emergency Backup Generator, including site work, installation of a 2500kW generator, a new electrical building, and associated infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-Build: Provide antioch water treatment plant (wtp) emergency backup generator under a progressive design-build agreement.
Posted Date
Oct 24, 2025
Due Date
Dec 11, 2025
Release: Oct 24, 2025
Close: Dec 11, 2025
Design-Build: Provide antioch water treatment plant (wtp) emergency backup generator under a progressive design-build agreement.
Premium
Access the largest public sector contact database
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
Posted Date
Oct 23, 2025
Due Date
Dec 11, 2025
Release: Oct 23, 2025
Close: Dec 11, 2025
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
Provide water treatment plant emergency generator addition.
Posted Date
Dec 1, 2025
Due Date
Jan 20, 2026
Release: Dec 1, 2025
Close: Jan 20, 2026
Provide water treatment plant emergency generator addition.
AvailableProvide sludge removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for the removal of accumulated solids from a water treatment plant sludge lagoon.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Provide sludge removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for the removal of accumulated solids from a water treatment plant sludge lagoon.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis