Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Barrow County
Barrow County Board of Commissioners solicits sealed bids for the Covered Bridge Road Water Main Extension (RFB2026-10). Bids are due at 2:00 PM Eastern on December 18, 2025 and must be submitted to the Barrow County Clerk’s Office in Winder, GA; construction documents are available via the county website.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Barrow County
Work includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Barrow County
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableCity of LaBelle
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
City of LaBelle
Close: Dec 16, 2025
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
AvailableBorough of Chambersburg
Project consists of water main extension project. See attached file.
Posted Date
Sep 12, 2025
Due Date
Dec 9, 2025
Release: Sep 12, 2025
Borough of Chambersburg
Close: Dec 9, 2025
Project consists of water main extension project. See attached file.
AvailableTown of Colchester
Creek farm road, bridge 10 project for resetting temporary bridge, removal of existing bridge and installing an aluminum box culvert, with associated roadway improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Town of Colchester
Close: Dec 11, 2025
Creek farm road, bridge 10 project for resetting temporary bridge, removal of existing bridge and installing an aluminum box culvert, with associated roadway improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis