Retrieving RFP details
Release
Close
City of Chickasaw
Resurfacing of street.
City of Lake Alfred
Provide street resurfacing services. All potholes shall be patched before resurfacing. Intersections when needed will be milled for a smooth transition. Roadways without curbing will be edged and swept before resurfacing. Roadways with curbing will be cleaned and free of vegetation before resurfacing. Resurfacing will be done with a minimum of two inches of type sp 9.5 or better asphalt. Roads to be milled will be done at a minimum of one inch. New surfacing will be done to ensure a smooth transition around manholes in the paved area. Preform manhole ring and cover adjustments. All traffic control and detouring will be the responsibility of the contractor.
City of Clarkston
Perform asphalt deep patching, associated street utility adjustments, milling, leveling, asphalt resurfacing and re-striping on various city streets.
City of Toledo
This project will resurface 0.86 miles of pavement. This includes removing the existing wearing course, performing necessary pavement repairs, resurfacing, the installation of pedestrian ramps, and minor drainage improvements.
Release
Nov 05, 2025
Close
Dec 10, 2025