Summary
Work includes demolition as required, fabrication and installation of stainless steel wall/bench/panel systems, replacement/adjustment of associated fixtures, waterproofing, penetrations, anchorage, and final cleanup; supply and install 16-gauge stainless steel (specify alloy, e.g., 304) panels, benches, shower surrounds, and trim per approved drawings and manufacturer recommendations; all stainless edges shall be hemmed/rolled to prevent sharp edges; exposed welds ground and finished to match; provide stainless fasteners and concealed anchorage as required for security and vandal resistance; replace or reset shower valves, heads, drains, and scuppers as required; coordinate with county plumbing maintenance (or subcontract plumber). See attached file.