Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Gallatin is seeking to retain professional engineering consulting firms to design and prepare final construction plans for the South Westland Avenue (Bridge 833328 over CSX) replacement project, including preliminary engineering, environmental investigations, public involvement, surveying, right-of-way acquisition, utility/rail coordination, and preparation of bid documents. The project will replace the existing bridge with a new two-lane bridge with sidewalks, realign approaches, improve drainage, and relocate utilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide consulting services to advise City of Vancouver staff on cultural resource issues related to the Interstate Bridge Replacement (IBR) Program.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Provide consulting services to advise City of Vancouver staff on cultural resource issues related to the Interstate Bridge Replacement (IBR) Program.
AvailablePremium
Access the largest public sector contact database
City of Gallatin seeks engineering consulting firms for design and final construction plans for replacement of Bridge 833328 on South Westland Avenue over CSX rail lines. Scope includes site and structural design, demolition, new bridge construction, approach realignment, drainage improvements, utility relocation, surveying, ROW and easement acquisition, railroad coordination, environmental investigations, public involvement, and preparation of bid/construction documents. Prime and all subconsultants must be on TDOT's pre-approved list and the prime must have unlimited status. Submittal requires a Letter of Interest and a Statement of Qualifications (max 15 sheets/30 electronic pages), two bound copies plus a PDF on external storage; deliver to Jake Wilson, Assistant City Engineer.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
City of Gallatin seeks engineering consulting firms for design and final construction plans for replacement of Bridge 833328 on South Westland Avenue over CSX rail lines. Scope includes site and structural design, demolition, new bridge construction, approach realignment, drainage improvements, utility relocation, surveying, ROW and easement acquisition, railroad coordination, environmental investigations, public involvement, and preparation of bid/construction documents. Prime and all subconsultants must be on TDOT's pre-approved list and the prime must have unlimited status. Submittal requires a Letter of Interest and a Statement of Qualifications (max 15 sheets/30 electronic pages), two bound copies plus a PDF on external storage; deliver to Jake Wilson, Assistant City Engineer.
AvailableThe owner seeks a collaborative design build firm for the purposes of renovation of the pedestrian bridge. Restore the bridge to full functionality, noting DSA confirmed a full structural retrofit would not be required. Maintain consistent specs and finishes; avoid elevators and chair lifts, reducing mechanical/electrical scope as much as possible; reduce future maintenance requirements; tie into the existing campus and limit impact to the site; meet all DSA requirements, including ADA codes; provide an efficient design-build process which meets an established design and construction budget.
Posted Date
Oct 31, 2025
Due Date
Dec 12, 2025
Release: Oct 31, 2025
Close: Dec 12, 2025
The owner seeks a collaborative design build firm for the purposes of renovation of the pedestrian bridge. Restore the bridge to full functionality, noting DSA confirmed a full structural retrofit would not be required. Maintain consistent specs and finishes; avoid elevators and chair lifts, reducing mechanical/electrical scope as much as possible; reduce future maintenance requirements; tie into the existing campus and limit impact to the site; meet all DSA requirements, including ADA codes; provide an efficient design-build process which meets an established design and construction budget.
The Town of Sledge is soliciting qualifications from firms or individuals to provide engineering services for implementation of approved FY 2026 CDBG project(s), including preparing cost estimates, plans and specifications, bidding assistance, contract execution, pre-construction conferences, and construction inspection. The RFQ encourages MBE/WBE participation and states proposals will be evaluated on qualifications, experience, and capacity for performance. The contract will be fixed-price covering the scope through project closeout and the Town reserves the right to reject any or all proposals.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
The Town of Sledge is soliciting qualifications from firms or individuals to provide engineering services for implementation of approved FY 2026 CDBG project(s), including preparing cost estimates, plans and specifications, bidding assistance, contract execution, pre-construction conferences, and construction inspection. The RFQ encourages MBE/WBE participation and states proposals will be evaluated on qualifications, experience, and capacity for performance. The contract will be fixed-price covering the scope through project closeout and the Town reserves the right to reject any or all proposals.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis