Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Professional design engineering consultant services for a stormwater and roadway improvement project on Koepke Road, encompassing design, permitting, and construction plan preparation for storm sewer upgrades and roadway resurfacing on Koepke Road, Keystone Road, and Miller Road.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of engineering services for preliminary engineering reports, design, and construction administration for the replacement/upgrade of water and sewer lines, stormwater drainage, fire hydrants, sidewalks, and roadway repairs on Martin Luther King Jr. Drive, Church Street, and Roundtree Street in Statesboro.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Premium
Access the largest public sector contact database
Procurement of engineering services for preliminary engineering reports, design, and construction administration for the replacement/upgrade of water and sewer lines, stormwater drainage, fire hydrants, sidewalks, and roadway repairs on Martin Luther King Jr. Drive, Church Street, and Roundtree Street in Statesboro.
Provide roadway and infrastructure improvements, will include the installation of water and sewer services, storm water ponds and drain system, curb and sidewalks, clearing and grubbing, maintenance of traffic throughout the project, and all other aspects. See outside link.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Provide roadway and infrastructure improvements, will include the installation of water and sewer services, storm water ponds and drain system, curb and sidewalks, clearing and grubbing, maintenance of traffic throughout the project, and all other aspects. See outside link.
AvailableThe buyer seeks contractors to provide emergency and on‐call repair services for storm sewer and roadway systems on an as‐needed basis. The work typically includes furnishing labor, materials, and equipment to perform repairs to drainage and roadway infrastructure under emergency, critical, and scheduled conditions. The engagement is structured as a single solicitation with a set closing date for vendor submissions via the buyer’s official BidNet portal.
Posted Date
Dec 13, 2025
Due Date
Jan 20, 2026
Release: Dec 13, 2025
Close: Jan 20, 2026
The buyer seeks contractors to provide emergency and on‐call repair services for storm sewer and roadway systems on an as‐needed basis. The work typically includes furnishing labor, materials, and equipment to perform repairs to drainage and roadway infrastructure under emergency, critical, and scheduled conditions. The engagement is structured as a single solicitation with a set closing date for vendor submissions via the buyer’s official BidNet portal.
AvailableThe City of Statesboro seeks statements of qualifications and proposals from engineering firms to prepare a Preliminary Engineering Report (PER), final design, and provide construction administration for a FY2026 CDBG-funded community infrastructure project. Work includes replacement/upgrades to potable water transmission and service lines, sanitary sewer transmission/service lines, stormwater drainage improvements (including runoff analysis), installation of fire hydrants, sidewalks, and roadway repairs/resurfacing on Martin Luther King Jr. Drive, Church Street, and Roundtree Street. The draft PER is required by March 13, 2026 and firms must demonstrate federal funds engineering experience, provide SOQ, fee information, errors & omissions insurance, and other requested documentation.
Posted Date
Dec 9, 2025
Due Date
Jan 12, 2026
Release: Dec 9, 2025
Close: Jan 12, 2026
The City of Statesboro seeks statements of qualifications and proposals from engineering firms to prepare a Preliminary Engineering Report (PER), final design, and provide construction administration for a FY2026 CDBG-funded community infrastructure project. Work includes replacement/upgrades to potable water transmission and service lines, sanitary sewer transmission/service lines, stormwater drainage improvements (including runoff analysis), installation of fire hydrants, sidewalks, and roadway repairs/resurfacing on Martin Luther King Jr. Drive, Church Street, and Roundtree Street. The draft PER is required by March 13, 2026 and firms must demonstrate federal funds engineering experience, provide SOQ, fee information, errors & omissions insurance, and other requested documentation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis