Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
High school roof replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Roof replacement services for the Freeport High School Library.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Roof replacement services for the Freeport High School Library.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for the replacement or overlay of specific roof sections (5, 6, and 9) at Columbus High School.
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
RFP for the replacement or overlay of specific roof sections (5, 6, and 9) at Columbus High School.
AvailableRemove and replace the roof estimated at approx. 8800 square feet at fire station 9. Remove and legally dispose of existing roof system (including edge metal) to the metal deck. Install tapered poly iso roof insulation system starting with r15 minimum thickness at drains. Install (per manufacturer's specifications) white, reinforced, fully adhered, 60 mil thick, tpo roof membrane system. Install required flashings for all existing roof penetrations. Fabricate and install new 24-gauge prefinished perimeter edge metal, coping and counterflashing.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Remove and replace the roof estimated at approx. 8800 square feet at fire station 9. Remove and legally dispose of existing roof system (including edge metal) to the metal deck. Install tapered poly iso roof insulation system starting with r15 minimum thickness at drains. Install (per manufacturer's specifications) white, reinforced, fully adhered, 60 mil thick, tpo roof membrane system. Install required flashings for all existing roof penetrations. Fabricate and install new 24-gauge prefinished perimeter edge metal, coping and counterflashing.
AvailableRoof replacement.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →