Summary
Work includes removal, preparation, installing a moisture mitigation product in hallway certain areas, approx 1200 SF of ongrade, slab surface areas located in the foreign language wing of lhs,and replacement of approx 5,200 sf of vct flooring in hallway spaces with a linoleum tile product at littleton high school. See floor plans attached. Contractors are responsible for taking any space measurements and verifying total square footage and required materials. Removal and disposal of existing vct tiles, preparing floor with moisture mitigation product, installation of new linoleum tile product, marmoleum floor tiles and base cove molding.