Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Replacement of Sound System.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Township of Grosse Ile, Michigan is re-soliciting proposals for a bridge consultant to provide professional engineering services related to a local bridge project. Responses are due by December 17, 2025 at 2:00 PM EST.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
The Township of Grosse Ile, Michigan is re-soliciting proposals for a bridge consultant to provide professional engineering services related to a local bridge project. Responses are due by December 17, 2025 at 2:00 PM EST.
AvailablePremium
Access the largest public sector contact database
Provide replacement of the magnetic flow meter includes temporary plug and drain existing 30"sewer line during construction; removal of existing 28" magnetic flow meter inside manhole located outside the wwtp building; installation of new 28" magnetic flow meter that will replace the removed one. Flowmeter purchased by others; removal of the existing cable from existing manhole to the wwtp building; installation of 180 LF of new cable from proposed meter located inside manhole to the wwtp building. Cable purchased by others; removal of existing flow converter inside the building and replacement with new flow converter all mounted inside the building. Flow converter is purchased by others; and associated works. See attached file.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Provide replacement of the magnetic flow meter includes temporary plug and drain existing 30"sewer line during construction; removal of existing 28" magnetic flow meter inside manhole located outside the wwtp building; installation of new 28" magnetic flow meter that will replace the removed one. Flowmeter purchased by others; removal of the existing cable from existing manhole to the wwtp building; installation of 180 LF of new cable from proposed meter located inside manhole to the wwtp building. Cable purchased by others; removal of existing flow converter inside the building and replacement with new flow converter all mounted inside the building. Flow converter is purchased by others; and associated works. See attached file.
AvailableProject consists of removing the existing centralized sound system serving the pool, gymnasiums, black box theater, main theater and commons areas, and replacing with a new distributed sound system in each area.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Close: Dec 16, 2025
Project consists of removing the existing centralized sound system serving the pool, gymnasiums, black box theater, main theater and commons areas, and replacing with a new distributed sound system in each area.
AvailableThe project entails replacing the existing intercom system with a three (3) channel Master Station and Power Supply and replace the jail cell station intercoms (15). Use Cat – 6 cables with new devices.
Posted Date
Dec 3, 2025
Due Date
Dec 13, 2025
Release: Dec 3, 2025
Close: Dec 13, 2025
The project entails replacing the existing intercom system with a three (3) channel Master Station and Power Supply and replace the jail cell station intercoms (15). Use Cat – 6 cables with new devices.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis