Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide replacement of the magnetic flow meter includes temporary plug and drain existing 30"sewer line during construction; removal of existing 28" magnetic flow meter inside manhole located outside the wwtp building; installation of new 28" magnetic flow meter that will replace the removed one. Flowmeter purchased by others; removal of the existing cable from existing manhole to the wwtp building; installation of 180 LF of new cable from proposed meter located inside manhole to the wwtp building. Cable purchased by others; removal of existing flow converter inside the building and replacement with new flow converter all mounted inside the building. Flow converter is purchased by others; and associated works. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableProvide construction of wastewater treatment plant office.
Posted Date
Nov 16, 2025
Due Date
Jan 14, 2026
Release: Nov 16, 2025
Close: Jan 14, 2026
Provide construction of wastewater treatment plant office.
AvailableThe work consist of approx 2,686 LF silt fence; 6,700 SY chip seal pavement/roadway section; 1 LS 2" schedule 80 PVC potable water line, connections, and meter box; 1 LS 16" DI treatment effluent line, connections, valves, and fittings; 2 EA 1" yard hydrant; 1,450 LF 15" PVC sdr 2 gravity sewer; 1,450 LF trench safety.
Posted Date
Dec 6, 2025
Due Date
Jan 16, 2026
Release: Dec 6, 2025
Close: Jan 16, 2026
The work consist of approx 2,686 LF silt fence; 6,700 SY chip seal pavement/roadway section; 1 LS 2" schedule 80 PVC potable water line, connections, and meter box; 1 LS 16" DI treatment effluent line, connections, valves, and fittings; 2 EA 1" yard hydrant; 1,450 LF 15" PVC sdr 2 gravity sewer; 1,450 LF trench safety.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis