Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of Replacement of Asphalt & Ramps. Work includes, demolition of 11 wood ramps; Temporary fence around work site with privacy screen; Saw, cut, and demo approximately 4,690 SF of existing asphalt pavement; Build x10 new concrete ramps with curbs that are less than 8% in slope and have ADA compliant landings at top and bottom. #4 rebar @16" o.c. Ramps to have thickened edge that goes 12" into the grade; Install approx 4,690 SF of new concrete flatwork at 4" thick with #4 rebar @ 16" o.c. over 4" base. 4,000 psi 1" rock mix 0.45 w/c ratio. Medium broom finish; Remove and replace parking bumpers to allow for saw cutting a straight edge on the existing asphalt to edge the new concrete correctly. Reinstall parking wheel stops after work is completed. Pressure-wash parking lot after construction is completed & remove temporary fence and toilet after punch walk.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Full depth reclamation of existing asphalt, Apshalt removal and replacement, HMA patching, storm sewer install, removal and replacement of concrete curb ramps, sidewalk, curb, gutter, valley pans, cross pans at multiple locations.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
Full depth reclamation of existing asphalt, Apshalt removal and replacement, HMA patching, storm sewer install, removal and replacement of concrete curb ramps, sidewalk, curb, gutter, valley pans, cross pans at multiple locations.
AvailableWork includes 43,353 SY - mill / remove asphalt pavement; 1,969 SY - pulverize asphalt pavement; 52,221 SY - base fine grading; 10,672 ton - hot mix asphalt; 48 EA - manhole casting height adjustment; 45 EA - water valve stem top; replacement.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
Work includes 43,353 SY - mill / remove asphalt pavement; 1,969 SY - pulverize asphalt pavement; 52,221 SY - base fine grading; 10,672 ton - hot mix asphalt; 48 EA - manhole casting height adjustment; 45 EA - water valve stem top; replacement.
AvailableSeeking for the removal and replacement of the current asphalt shingle roof.
Posted Date
Jan 22, 2026
Due Date
Feb 4, 2026
Release: Jan 22, 2026
Close: Feb 4, 2026
Seeking for the removal and replacement of the current asphalt shingle roof.
Available0.36 mi of hot mix asphalt cold milling and resurfacing, concrete curb, sidewalk and ramps, signing and pavement markings.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
0.36 mi of hot mix asphalt cold milling and resurfacing, concrete curb, sidewalk and ramps, signing and pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis