Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope of work: replace two existing earthen lagoons with two new cast-in-place reinforced concrete lagoons including temporary piping system, residual management, selective demolition, clearing, removal and replacement of fencing, exterior piping, fittings, valves, hydrants, manholes, flow metering equipment, site improvements, surface restorations and all other related Work complete as specified, and as evidently required to complete the Work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Walpole is soliciting contractors to replace two existing earthen lagoons with two new cast-in-place reinforced concrete lagoons, including temporary piping systems, residual management, selective demolition, clearing, replacement of fencing, exterior piping, fittings, valves, hydrants, manholes, flow metering equipment, site improvements, and surface restorations. A non-mandatory pre-bid site visit is scheduled for December 18, 2025 at 1:00 PM at the H.E. Willis Water Treatment Facility site.
Posted Date
Dec 3, 2025
Due Date
Dec 30, 2025
Release: Dec 3, 2025
Close: Dec 30, 2025
The Town of Walpole is soliciting contractors to replace two existing earthen lagoons with two new cast-in-place reinforced concrete lagoons, including temporary piping systems, residual management, selective demolition, clearing, replacement of fencing, exterior piping, fittings, valves, hydrants, manholes, flow metering equipment, site improvements, and surface restorations. A non-mandatory pre-bid site visit is scheduled for December 18, 2025 at 1:00 PM at the H.E. Willis Water Treatment Facility site.
AvailableWork consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Sep 2, 2025
Due Date
Feb 3, 2026
Release: Sep 2, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableMine, landfill, sludge treatment and disposal facility inspection services.
Posted Date
Oct 6, 2025
Due Date
Jan 6, 2026
Release: Oct 6, 2025
Close: Jan 6, 2026
Mine, landfill, sludge treatment and disposal facility inspection services.
AvailableProject consists water treatment facility upgrade. See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 1, 2026
Release: Dec 3, 2025
Close: Jan 1, 2026
Project consists water treatment facility upgrade. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis