Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves furnishing all parts, materials, supplies, equipment, labor, and transportation to remove a monitoring manway, a spill bucket, and the concrete over the lids for an Underground Fuel Storage (UST) Tank. The scope of work includes removing existing components, installing a new double wall spill bucket, and replacing two concrete pads. The contractor will also be required to test the newly installed spill bucket and monitoring manway for leaks and complete any necessary repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Department of the Air Force, Global Strike Command issued a pre-solicitation for contractors to remove and replace an underground storage tank (UST) monitoring manway, spill bucket, concrete lids, and associated piping/equipment at a Missile Alert Facility (F.E. Warren AFB). The project requires completion within a 90-calendar day performance period, adherence to base security and permitting requirements, and includes installation of double-walled spill buckets, monitoring equipment (Veeder-Root alarm systems, probe/sensor cards), and upgrades to fill/drop tubes and related piping and wiring. The procurement is a Total Small Business set-aside under NAICS 238910 and is soliciting capability information from qualified contractors.
Posted Date
Dec 30, 2025
Due Date
Jan 19, 2026
Release: Dec 30, 2025
Close: Jan 19, 2026
The Department of the Air Force, Global Strike Command issued a pre-solicitation for contractors to remove and replace an underground storage tank (UST) monitoring manway, spill bucket, concrete lids, and associated piping/equipment at a Missile Alert Facility (F.E. Warren AFB). The project requires completion within a 90-calendar day performance period, adherence to base security and permitting requirements, and includes installation of double-walled spill buckets, monitoring equipment (Veeder-Root alarm systems, probe/sensor cards), and upgrades to fill/drop tubes and related piping and wiring. The procurement is a Total Small Business set-aside under NAICS 238910 and is soliciting capability information from qualified contractors.
AvailableThis Sources Sought notice seeks information from small businesses to support removal and replacement of an underground fuel tank monitoring manway, spill bucket, and associated concrete pads, including installation of interstitial monitoring (drop tubes, Veeder-Root alarm, probe/sensor card), upgrading fill tubes, piping, conduit, wiring, and leak testing. Work will be performed at Missile Alert Facilities (including F.E. Warren AFB) across Colorado, Nebraska, and Wyoming with a period of performance of 90 calendar days. The notice is a Small Business set-aside (NAICS 238910) issued by Global Strike Command (AFGSC) and administratively associated with F.E. Warren AFB; responses are due 2026-01-19 12:00 p.m. EST.
Posted Date
Dec 30, 2025
Due Date
Jan 19, 2026
Release: Dec 30, 2025
Close: Jan 19, 2026
This Sources Sought notice seeks information from small businesses to support removal and replacement of an underground fuel tank monitoring manway, spill bucket, and associated concrete pads, including installation of interstitial monitoring (drop tubes, Veeder-Root alarm, probe/sensor card), upgrading fill tubes, piping, conduit, wiring, and leak testing. Work will be performed at Missile Alert Facilities (including F.E. Warren AFB) across Colorado, Nebraska, and Wyoming with a period of performance of 90 calendar days. The notice is a Small Business set-aside (NAICS 238910) issued by Global Strike Command (AFGSC) and administratively associated with F.E. Warren AFB; responses are due 2026-01-19 12:00 p.m. EST.
Replace concrete terrazzo, phase 2.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
Replace concrete terrazzo, phase 2.
AvailableReplace concrete slab and base.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Replace concrete slab and base.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis