Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the existing site electrical pedestals on the lawn.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace the existing transportation management systems field elements.
Posted Date
Oct 27, 2025
Due Date
Dec 17, 2025
Release: Oct 27, 2025
Close: Dec 17, 2025
Replace the existing transportation management systems field elements.
AvailablePremium
Access the largest public sector contact database
Electrical work. See attached file and outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Electrical work. See attached file and outside link.
AvailableThe Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). The Phase I Electrical Site Enabling scope includes: Testing of the existing MV system (MV-LS1, MV-LS2, MV-LS3, and all MV cabling runs; Installation of a new dual-chimney manhole; Installation of new HU interim switch and metering equipment (at grade near the Mars Music Hall docks). See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). The Phase I Electrical Site Enabling scope includes: Testing of the existing MV system (MV-LS1, MV-LS2, MV-LS3, and all MV cabling runs; Installation of a new dual-chimney manhole; Installation of new HU interim switch and metering equipment (at grade near the Mars Music Hall docks). See outside link.
AvailableReplace HVAC System at Transfer Station Compost Office
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Replace HVAC System at Transfer Station Compost Office
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis