Summary
Project work includes: Secure all necessary permits from Salem County for performance of the roof replacement work. Removal of the existing multiple roof membranes, insulation board material, parapet
wall metal cap and existing crickets in their entirety. Inspect the metal decking and replace as necessary. Spot paint with a rust inhibitor at localized early rust locations. All removed roofing components are to be contained in dumpsters and transported from the work site. Provide and install 2” ISO insulation board over the metal to existing roof drains. Provide and install new 60 mil TPO solid white roof membrane mechanically, fastened with a minimum 20-year warranty. A white surface on a black membrane is not acceptable.
Follow manufacturers requirements for fitting at roof penetrations.
Provide manufacturers’ recommended termination bars at the HVAC curbing unit, parapet wall metal capping and at all roof penetrations. Check all roof drains and remove clogs if found.
Provide catalogue cuts for all materials to be installed.