Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Otay Municipal Water District
Work consists of replace pumps & motors. replace Two (2) Peerless recirculating pumps with U.S. Electrical Motors brand motors; One (1) U.S. Electrical Motors Titan II brand pump motor for Pump.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
San Jacinto River Authority
Lake Houston Pump Station Pumps, Motors and Variable Frequency Drives.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
San Jacinto River Authority
Close: Jan 8, 2026
Lake Houston Pump Station Pumps, Motors and Variable Frequency Drives.
AvailableVirginia Department of Conservation and Recreation
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Virginia Department of Conservation and Recreation
Close: Dec 17, 2025
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
AvailableSanta Clarita Valley Water Agency
Construction of the pump station. The project generally consists of construction of a 7,200 SF building to serve as a potable water pump station with backup generator. The pump station includes but not limited to the suction and discharge headers, eight pump cans, four pumps, four motors, and associated electrical power distribution, lighting, and instrumentation & controls; and site work including a paved service road, site security fencing, and all associated work ("Work") as indication in the Contract Documents.
Posted Date
Oct 10, 2025
Due Date
Dec 17, 2025
Release: Oct 10, 2025
Santa Clarita Valley Water Agency
Close: Dec 17, 2025
Construction of the pump station. The project generally consists of construction of a 7,200 SF building to serve as a potable water pump station with backup generator. The pump station includes but not limited to the suction and discharge headers, eight pump cans, four pumps, four motors, and associated electrical power distribution, lighting, and instrumentation & controls; and site work including a paved service road, site security fencing, and all associated work ("Work") as indication in the Contract Documents.
AvailableGreat Lakes Water Authority
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 2, 2025
Release: Jul 16, 2025
Great Lakes Water Authority
Close: Dec 2, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis