Summary
This solicitation (Invitation for Bid B-27-HIDOT-00000360) requests a contractor to remove and replace an air-cooled self-contained air conditioning unit at the Wilson Tunnel Kalihi Portal electrical equipment room. The contractor must provide all labor, parts, and equipment, install a 1.5 Ton Liebert Mini-Mate2 Precision Cooling System Model MMD18APJE750ACY (or pre-approved equal), configure controls to match the existing system, and provide a minimum two-year performance guarantee. The project requires compliance with Hawaii Standard Specifications and typical procurement requirements (performance bond, vendor registration, indemnification) and includes scope documents and drawings as attached files on the buyer site.