Summary
Replace Feed Water Piping at Building 136 at Watervliet Arsenal requires the contractor to provide all labor, materials, parts, and equipment to remove and replace feed water piping (including removal of approximately 70 linear feet of 4-inch carbon steel) and to replace two existing backflow preventers with government‑supplied units; all new piping and fittings must be insulated and labeled per ANSI/ASME A13.1. The procurement is a firm fixed price, Small Business (SBA) set‑aside under NAICS 237110 with an estimated value of $25,000–$100,000, requires 100% payment bond (and performance bond if quote > $150k), and wage determination NY2 applies. The period of performance is 45 calendar days from receipt of the Notice to Proceed; the opportunity was posted 2026-06-30 and proposals are due 2026-07-15.