Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Turner County
Remove all rotten wood and install new siding and new shutters. All soffits need to be repaired and repainted. Clean and repaint canopy. Replace all countertops. Replace 5 windows. Must match other windows. Repair sheetrock where it is needed. Repaint all walls, trim work, and cabinets. Replace water heater - The recirculating pump is bad. Remove all carpet and replace with VCT Vinyl squares in waiting area and VCT planks in the back part of building. Lights in the middle area of the building need to be replaced. All A/C units are bad and need to be replaced. Fire sprinkler system PIV valves outside are broken and need to be replaced. The contractor will need to provide a dumpster for the debris.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Turner County
Remove all rotten wood and install new siding and new shutters. All soffits need to be repaired and repainted. Clean and repaint canopy. Replace all countertops. Replace 5 windows. Must match other windows. Repair sheetrock where it is needed. Repaint all walls, trim work, and cabinets. Replace water heater - The recirculating pump is bad. Remove all carpet and replace with VCT Vinyl squares in waiting area and VCT planks in the back part of building. Lights in the middle area of the building need to be replaced. All A/C units are bad and need to be replaced. Fire sprinkler system PIV valves outside are broken and need to be replaced. The contractor will need to provide a dumpster for the debris.
Posted Date
-
Due Date
Dec 8, 2025
Release: -
Turner County
Close: Dec 8, 2025
Remove all rotten wood and install new siding and new shutters. All soffits need to be repaired and repainted. Clean and repaint canopy. Replace all countertops. Replace 5 windows. Must match other windows. Repair sheetrock where it is needed. Repaint all walls, trim work, and cabinets. Replace water heater - The recirculating pump is bad. Remove all carpet and replace with VCT Vinyl squares in waiting area and VCT planks in the back part of building. Lights in the middle area of the building need to be replaced. All A/C units are bad and need to be replaced. Fire sprinkler system PIV valves outside are broken and need to be replaced. The contractor will need to provide a dumpster for the debris.
AvailableWayne County
Wayne County, North Carolina has issued an invitation for bids titled “2025 RFB Jeffery’s Building Windows,” posted on November 17, 2025. Bids are due December 4, 2025 at 2:00 PM local time, and documents are accessible via the county’s plan holder form.
Posted Date
Nov 17, 2025
Due Date
Dec 4, 2025
Release: Nov 17, 2025
Wayne County
Close: Dec 4, 2025
Wayne County, North Carolina has issued an invitation for bids titled “2025 RFB Jeffery’s Building Windows,” posted on November 17, 2025. Bids are due December 4, 2025 at 2:00 PM local time, and documents are accessible via the county’s plan holder form.
AvailableConewago Township
Design and construction of a pole building.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Conewago Township
Close: Nov 20, 2025
Design and construction of a pole building.
Southeastern Oklahoma State University
The owner is seeking a complete end-to-end and fully functional data infrastructure for our science building on our main campus. Network switches, phone systems, wireless access points, and end point devices are not to be considered as part of the data infrastructure. All hardware, racks, patch panels, patch cords, and supplies are to be provided, installed, and tested, to be made fully operational. Test results must be supplied for each building individually before final inspection of completion.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Southeastern Oklahoma State University
Close: Dec 16, 2025
The owner is seeking a complete end-to-end and fully functional data infrastructure for our science building on our main campus. Network switches, phone systems, wireless access points, and end point devices are not to be considered as part of the data infrastructure. All hardware, racks, patch panels, patch cords, and supplies are to be provided, installed, and tested, to be made fully operational. Test results must be supplied for each building individually before final inspection of completion.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis