Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Conewago Township
Design and construction of a pole building.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Conewago Township
Design and construction of roof-mounted solar energy electrical power generation system and associated electrical work.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Conewago Township
Close: Nov 20, 2025
Design and construction of roof-mounted solar energy electrical power generation system and associated electrical work.
Town of Southington
Provide high school rooftop solar photovoltaic project.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
Town of Southington
Close: Nov 20, 2025
Provide high school rooftop solar photovoltaic project.
City of Dunwoody
Work includes to design, installation, financing, operations and maintenance of two (2) rooftop solar photovoltaic (pv) systems.
Posted Date
Oct 17, 2025
Due Date
Dec 8, 2025
Release: Oct 17, 2025
City of Dunwoody
Close: Dec 8, 2025
Work includes to design, installation, financing, operations and maintenance of two (2) rooftop solar photovoltaic (pv) systems.
AvailableCity of Dade City
Install a prefabricated metal building system measuring 60 feet by 120 feet, following erection of the primary 60' x 120' building, the project will include the construction of various administrative spaces (such as offices, meeting rooms, and support areas), including the installation of lighting, HVAC, windows, and interior finishes. Work shall include, but is not limited to: 1. Design & engineering: - provide stamped structural drawings and calculations by a licensed professional engineer. - ensure compliance with all local codes, category 5 hurricane wind speeds, snow load, and seismic requirements. - provide architectural and MED (mechanical, electrical, plumbing) design for interior administrative spaces within the building.
Posted Date
Oct 19, 2025
Due Date
Dec 4, 2025
Release: Oct 19, 2025
City of Dade City
Close: Dec 4, 2025
Install a prefabricated metal building system measuring 60 feet by 120 feet, following erection of the primary 60' x 120' building, the project will include the construction of various administrative spaces (such as offices, meeting rooms, and support areas), including the installation of lighting, HVAC, windows, and interior finishes. Work shall include, but is not limited to: 1. Design & engineering: - provide stamped structural drawings and calculations by a licensed professional engineer. - ensure compliance with all local codes, category 5 hurricane wind speeds, snow load, and seismic requirements. - provide architectural and MED (mechanical, electrical, plumbing) design for interior administrative spaces within the building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis