Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-bid-Build. Repair base switching station. Demolition of the existing Switching Station. Upgrade and modernize the existing distribution switching station to current industry standards and performance by constructing a new building to serve as a switchgear enclosure. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Department of the Air Force requires a design-bid-build project to upgrade and modernize the electrical distribution switching station at Mountain Home Air Force Base, Idaho, including construction of a new switchgear enclosure and demolition of the old facility. The project involves procurement of materials, coordination with Idaho Power Company, and a performance period of 850 calendar days. This is a Sources Sought market research solicitation with a small-business set-aside, with responses due by February 6, 2026.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
The Department of the Air Force requires a design-bid-build project to upgrade and modernize the electrical distribution switching station at Mountain Home Air Force Base, Idaho, including construction of a new switchgear enclosure and demolition of the old facility. The project involves procurement of materials, coordination with Idaho Power Company, and a performance period of 850 calendar days. This is a Sources Sought market research solicitation with a small-business set-aside, with responses due by February 6, 2026.
AvailableContractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of switching station, stage 01. The principal components of the work involve miscellaneous sitework, demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; providing steel structures; installing Government-Furnished equipment including power circuit breakers, disconnecting switches, coupling capactor voltage transformers, surge arrester, voltage transformers, and control cable,; providing station battery sytems, switchboard sections, high voltage bus, grounding, conduit, cable trench, distribution panels, miscellaneous electrical, communication facilities, fiber optic cables and equipment, and constructing a site-built contol builing complete with electrical and mechanical systems.
Posted Date
Dec 22, 2025
Due Date
Feb 7, 2026
Release: Dec 22, 2025
The Department of the Air Force (Air Combat Command) issued a presolicitation/sources sought notice for the design, fabrication, installation, and commissioning of a 300 GPM Oil Water Separator (OWS) system at the Hush House on Mountain Home Air Force Base in Idaho. The procurement is set aside for SBA-certified Woman-Owned Small Businesses (WOSB) with an estimated contract magnitude of $250,000 to $500,000 and requires compliance with UFC, EPA, NPDES, FAR, NFPA, and NEC standards. The projected solicitation release date is 2026-01-29 and the projected response/offer date is 2026-01-29 (10:00 AM MST), with an expected contract completion within 50 calendar days after Notice to Proceed.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
Close: Jan 29, 2026
4 ea, switching unit, Audi, NSN: 5821017169518.
Posted Date
Nov 25, 2025
Due Date
Feb 18, 2026
Release: Nov 25, 2025
Close: Feb 18, 2026
4 ea, switching unit, Audi, NSN: 5821017169518.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of switching station, stage 01. The principal components of the work involve miscellaneous sitework, demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; providing steel structures; installing Government-Furnished equipment including power circuit breakers, disconnecting switches, coupling capactor voltage transformers, surge arrester, voltage transformers, and control cable,; providing station battery sytems, switchboard sections, high voltage bus, grounding, conduit, cable trench, distribution panels, miscellaneous electrical, communication facilities, fiber optic cables and equipment, and constructing a site-built contol builing complete with electrical and mechanical systems.
AvailableThe Department of the Air Force (Air Combat Command) issued a presolicitation/sources sought notice for the design, fabrication, installation, and commissioning of a 300 GPM Oil Water Separator (OWS) system at the Hush House on Mountain Home Air Force Base in Idaho. The procurement is set aside for SBA-certified Woman-Owned Small Businesses (WOSB) with an estimated contract magnitude of $250,000 to $500,000 and requires compliance with UFC, EPA, NPDES, FAR, NFPA, and NEC standards. The projected solicitation release date is 2026-01-29 and the projected response/offer date is 2026-01-29 (10:00 AM MST), with an expected contract completion within 50 calendar days after Notice to Proceed.