Summary
Demolition: Remove existing substandard concrete and asphaltic pavement on Taxiway A, starting at end of Repair & Widen
Taxiways, Phase II (Taxiway A between Taxiway A1 and Taxiway A2) and extending past Taxiway D. Remove substandard concrete and asphaltic pavement on Taxiways A2 and J. Renovation: Provide and install new base course, drainage layer, new concrete pavement (PCC), site improvements, and improve storm water drainage. Clean and seal all joints on the pavements. Relocate taxiway edge lights, signage and paint taxi lines for base assigned and transient aircraft. Expand airfield pavements to meet standard by utilizing conventional design and construction methods to accommodate the mission. Pavements will be compatible with all applicable DoD, Air Force, and installation construction standards. See attached file.