Summary
Work includes minor concrete pavement repairs on the air trade center apron. Work generally includes repair of joint and corner spalls, cleaning and resealing of longitudinal and transverse joints, and other associated concrete pavement restoration items. Description: 1 ls of mobilization; 6000 LFT of clean and seal longitudinal and transverse joints in existing PCCP; 140 LFT of clean and seal expansion/isolation joints in existing PCCP; 100 LFT of route and seal cracks in existing PCCP (undistributed); 500 SFT of existing pccp joint spall repair (equal to or less than 4" depth); 30 SFT of existing PCCP corner spall repair (equal to or less than 4" depth).