Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct roadway improvements including 220 CY unclassified excavation, 335 tons crushed surfacing, 120 tons HMA, 200 LF curb and gutter, 80 SY concrete sidewalk, two curb ramps, storm drainage, 160 LF 12" PVC water main, 20 LF 6" DI watermain, one butterfly valve, one gate valve, and one hydrant assembly.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
AvailableWork consists of reconstruction of west riverside, 40-feet, work includes two-12-foot lanes (1 lane in each direction), curb and gutter, grading and drainage, and concrete driveways. West riverside lane will include sidewalk and ADA wheelchair accessible ramps where feasible.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
Work consists of reconstruction of west riverside, 40-feet, work includes two-12-foot lanes (1 lane in each direction), curb and gutter, grading and drainage, and concrete driveways. West riverside lane will include sidewalk and ADA wheelchair accessible ramps where feasible.
AvailableThe County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
AvailableThe Town of Jerome seeks sealed bids for the Deception Lane Water Line Improvements, a CDBG‑funded project to install approximately 1,500 linear feet of 6‑inch PVC water line, a regulator station, and new hydrants with associated roadway restoration. A pre‑bid meeting is scheduled for January 8, 2026 at 10:00 a.m. at Jerome Town Hall, and bidding documents are available via NACOG as noted in the legal notice. Bids must be delivered to the Town of Jerome by 2:00 p.m. on January 29, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
The Town of Jerome seeks sealed bids for the Deception Lane Water Line Improvements, a CDBG‑funded project to install approximately 1,500 linear feet of 6‑inch PVC water line, a regulator station, and new hydrants with associated roadway restoration. A pre‑bid meeting is scheduled for January 8, 2026 at 10:00 a.m. at Jerome Town Hall, and bidding documents are available via NACOG as noted in the legal notice. Bids must be delivered to the Town of Jerome by 2:00 p.m. on January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis