Summary
Removal and disposal of siding, trim, facia, soffit, windows and doors o Dumpster placement coordinated with DPW o Work site to remain neat and clean • Installation of approx. 2,340 SF of siding facia and trim o Rain screen to be applied under siding o Siding to be pre-primed vertical grain cedar clapboards with all cuts painted o Facia, soffit and trim to be white PVC; existing PVC trim can remain in place if in good condition o All mounting blocks for disconnects and lights to be PVC as well o 2 coats of paint applied to siding at a time suitable for exterior painting • Replacement of six windows o Replacement windows to be vinyl with tempered glass • Replacement of three metal doors and one metal double door o Doors to have tempered glass o Hardware and style to match existing • Installation of gutters o Roughly 180 LF of gutters needed across rear of the building o Gutter to be 6” and connect to existing drains in coordination with DPW •