Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This work involves removal of existing partition walls, installation of new partition walls, flooring installation, including alterations to existing ACT ceiling, mechanical, electrical, plumbing, and data.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes burge residence hall - renovate restrooms.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes burge residence hall - renovate restrooms.
AvailableProject consists of a renovation of the 2nd floor north office suite, 2nd floor single user women's restroom, printer room within the 2nd floor south office suite and adding a custodial room to the basement. The north office suite renovation entails but is not limited to: private office doors being replaced with full lite doors with sidelites, the removal of the 4 center room for an open space, new entrance to office suite, adding reverse bulkheads at windows, ceiling replacement were applicable, and new lighting throughout. Fire suppression is existing and to be modified as required. The 2nd floor Custodial room being relocated to the basement. The single user women's restroom on the 2nd floor is being renovated. A single room within the 2nd floor south entry suite is being updated to provide adequate HVAC, lighting and interior finishes.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Project consists of a renovation of the 2nd floor north office suite, 2nd floor single user women's restroom, printer room within the 2nd floor south office suite and adding a custodial room to the basement. The north office suite renovation entails but is not limited to: private office doors being replaced with full lite doors with sidelites, the removal of the 4 center room for an open space, new entrance to office suite, adding reverse bulkheads at windows, ceiling replacement were applicable, and new lighting throughout. Fire suppression is existing and to be modified as required. The 2nd floor Custodial room being relocated to the basement. The single user women's restroom on the 2nd floor is being renovated. A single room within the 2nd floor south entry suite is being updated to provide adequate HVAC, lighting and interior finishes.
AvailableNew York State Contract Reporter lists a subcontracting opportunity for the SUCF project to renovate the first floor of Farber Hall for psychology labs and a clinic at the University at Buffalo. SUCF’s bid calendar corroborates the project title and shows a bid date of January 28, 2026, with plans available via Avalon Document Services and a walk‑through on January 13, 2026. Subcontractors are being sought by the prime contractor for this construction project.
Posted Date
Jan 15, 2026
Due Date
Jan 28, 2026
Release: Jan 15, 2026
Close: Jan 28, 2026
New York State Contract Reporter lists a subcontracting opportunity for the SUCF project to renovate the first floor of Farber Hall for psychology labs and a clinic at the University at Buffalo. SUCF’s bid calendar corroborates the project title and shows a bid date of January 28, 2026, with plans available via Avalon Document Services and a walk‑through on January 13, 2026. Subcontractors are being sought by the prime contractor for this construction project.
AvailableProject will renovate the loading dock.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Project will renovate the loading dock.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis