Summary
Project includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.