Summary
Work includes approx. 353 SF of terminal building renovations- interior and exterior improvements(rooms 004Mech and 005 Corridor); 360 SY of 12" subgrade preparation; 20 LF of 4" PVC sanitary sewer pipe; 270 LF of 8" PVC roof drainage collector pipe; 4 EA of downspout connections; 170 LF of 4" HDPE footing drain collector; 230 LF of 1 1/2" water service pipe PEX-A; 230 SY of 6"pavement PCC class mix; 110 SY of 4" PCC sidewalk; pavement markings solvent' waterborne; conventional seedling, fertilizing and mulching; 130 LF of chain link fence; landscaping rock; 100 LF of gas service line from propane tank to building; 1,368 SF of change roofing type from standing seam roof