Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 194 SY class d patches, type IV, 12"; 66 SY hot-mix asphalt shoulders, 7"; 2 EA. Box culvert end sections, culvert no. 1; 272' precast concrete box culverts 10' x 4'; 452 SY geocomposite wall drain; 152' combination concrete curb and gutter, type b-6. 24; 16' precast concrete box culverts 10' x 4' (special); 452 SY membrane waterproofing system for buried structures; 12 SY stone riprap, class A3; 5,056 SY erosion control blanket.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
IDOT is soliciting bids to remove existing dual corrugated metal pipe culverts at three locations on IL Route 116 in Pontiac (Livingston County) and replace them with a precast concrete box culvert. The work includes ditch cleaning, pavement removal and replacement, landscaping, and other related construction activities. Bids are due at the January 16, 2026 letting at 12:00 PM local time.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids to remove existing dual corrugated metal pipe culverts at three locations on IL Route 116 in Pontiac (Livingston County) and replace them with a precast concrete box culvert. The work includes ditch cleaning, pavement removal and replacement, landscaping, and other related construction activities. Bids are due at the January 16, 2026 letting at 12:00 PM local time.
AvailableWork includes 227 SY partial depth patching; 222 SF concrete median surface removal; 55 LF underground conduit, coilable nonmetallic conduit, 2" dia.; 10 EA. manholes, type A, 4' dia., type 1 frame, closed lid; 4 EA. manholes, type A, 4' dia., type 5 frame, closed lid; 18,665 SY hot-mix asphalt surface removal, 1 1/2"; 3,286 SY hot-mix asphalt surface removal, 2 3/4"; 65 SY pavement patching, type IV, 12"; 180 SY pavement patching, type II, 14"; 29 LF pipe culverts, class A type 1 12"; 564 LF storm sewers, class A, type 2 12".
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes 227 SY partial depth patching; 222 SF concrete median surface removal; 55 LF underground conduit, coilable nonmetallic conduit, 2" dia.; 10 EA. manholes, type A, 4' dia., type 1 frame, closed lid; 4 EA. manholes, type A, 4' dia., type 5 frame, closed lid; 18,665 SY hot-mix asphalt surface removal, 1 1/2"; 3,286 SY hot-mix asphalt surface removal, 2 3/4"; 65 SY pavement patching, type IV, 12"; 180 SY pavement patching, type II, 14"; 29 LF pipe culverts, class A type 1 12"; 564 LF storm sewers, class A, type 2 12".
Work includes playground safety surface project. Protecting existing vegetation to remain. Removing existing vegetation. Clearing and grubbing. Stripping and removal of topsoil. Removing above- and below-grade site improvements. Disconnecting, capping or sealing, and removing site utilities. Temporary erosion- and sedimentation-control measures.
Posted Date
Jul 21, 2025
Due Date
Feb 3, 2026
Release: Jul 21, 2025
Close: Feb 3, 2026
Work includes playground safety surface project. Protecting existing vegetation to remain. Removing existing vegetation. Clearing and grubbing. Stripping and removal of topsoil. Removing above- and below-grade site improvements. Disconnecting, capping or sealing, and removing site utilities. Temporary erosion- and sedimentation-control measures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis