Summary
Work consist of roof, demo and replace all existing service walks, concrete along southern side of property should be pitched to move water away from the foundation, handrails- install graspable handrails at front entry stairs, fascia- install matching aluminum fascia cladding where missing, grading- regrade around foundation at all sides with screened top-spoil. Seed and straw, kitchen sink faucet- repair hot water faucet handle, toilet- remove toilet and replace flange/wax ring as necessary. Install new toilet base (homeowner to supply) and shim, adhere and caulk as necessary to stabilize. Reinstall existing tank. See attached file.