Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The West Virginia Purchasing Division, on behalf of the General Services Division, issued Centralized Request for Quote (CRFQ-0211-GSD2600000010) to perform a remodel of WB-1 and WB-2 in the West Wing of Building 1 at the WV State Capitol Complex (Charleston, Kanawha County), covering HVAC, electrical, flooring, interior finishes, cabinetry and plumbing fixtures. Bidders must follow the solicitation exhibits/project plans; a mandatory pre-bid meeting and technical question deadlines were published and proposals are due in mid-December 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The objective is to remodel/upgrade, paint walls, install floor and wall tile, install toilet partitions, install a vanity, sink, and faucet, remove and reinstall existing paper towel holders, lights, handrails, and mirrors for both bathrooms and remove the water fountains outside of the bathrooms. Tasks to be Performed: a) Bathroom 1 (118W x 107L x 96H): Remove existing concrete baseboards and square up the corners of the walls/floor. Remove toilet, urinal, sink, paper towel holder, soap dispenser, handrails (2), mirrors (2), wall light. See attached file.
Posted Date
Dec 5, 2025
Due Date
Dec 22, 2025
Release: Dec 5, 2025
Close: Dec 22, 2025
Premium
Access the largest public sector contact database
The objective is to remodel/upgrade, paint walls, install floor and wall tile, install toilet partitions, install a vanity, sink, and faucet, remove and reinstall existing paper towel holders, lights, handrails, and mirrors for both bathrooms and remove the water fountains outside of the bathrooms. Tasks to be Performed: a) Bathroom 1 (118W x 107L x 96H): Remove existing concrete baseboards and square up the corners of the walls/floor. Remove toilet, urinal, sink, paper towel holder, soap dispenser, handrails (2), mirrors (2), wall light. See attached file.
Work includes 1- general trades, 2- demolition, 3- concrete, 4- masonry, 5-structural steel & misc. Metals, 6- glazing, 7- acoustical ceilings, 8- fire suppression, 9- plumbing, 10- hvac, 11-electrical, 12- audio visual
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Close: Dec 12, 2025
Work includes 1- general trades, 2- demolition, 3- concrete, 4- masonry, 5-structural steel & misc. Metals, 6- glazing, 7- acoustical ceilings, 8- fire suppression, 9- plumbing, 10- hvac, 11-electrical, 12- audio visual
Project consists of east wing renovation - bid package wp-1.
Posted Date
Dec 5, 2025
Due Date
Dec 18, 2025
Release: Dec 5, 2025
Close: Dec 18, 2025
Project consists of east wing renovation - bid package wp-1.
AvailableWork consists of kitchenette remodel sewer personnel building.
Posted Date
Oct 6, 2025
Due Date
Dec 19, 2025
Release: Oct 6, 2025
Close: Dec 19, 2025
Work consists of kitchenette remodel sewer personnel building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis