Summary
Work shall include, but is not limited to, pulverize, demolish, and remove existing pavement section. Pulverize, demolish, and remove existing pavement section. Remove and dispose existing taxiway edge lights, conduit, and remove and dispose existing taxiway edge lights, conduit, and conductor. Earthwork and subgrade preparation, including lime-treatment and earthwork and subgrade preparation, including lime-treatment and subgrade removal and replacement with open graded material. Construct new pavement section, including p-209 aggregate base construct new pavement section, including p-209 aggregate base and p-401 asphalt pavement. Install new taxiway edge lights, including new conduit and install new taxiway edge lights, including new conduit and conductor. Raise existing taxiway edge lights. See outside link.