Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Santa Barbara
The City of Santa Barbara is seeking bids to refurbish Hoist #2 on the City Pier, including replacement of the winch assembly, control circuits, electrical panel and service disconnect. The selected contractor must provide all materials, equipment, and labor, comply with prevailing wage and insurance requirements, and provide bonds if applicable.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Naval Supply Systems Command (NAVSUP)
3 Ea 2-ton Chain Hoist, National Stock Number 3020017133757.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 15, 2025
3 Ea 2-ton Chain Hoist, National Stock Number 3020017133757.
AvailablePenticton
The City of Penticton seeks proposals for the replacement of Penticton Pier, including removal of the existing pier, construction of a new pier, and installation of landscaping and lighting. Substantial performance is required by April 30, 2026.
Posted Date
Nov 4, 2025
Due Date
Nov 27, 2025
Release: Nov 4, 2025
Penticton
Close: Nov 27, 2025
The City of Penticton seeks proposals for the replacement of Penticton Pier, including removal of the existing pier, construction of a new pier, and installation of landscaping and lighting. Substantial performance is required by April 30, 2026.
AvailableCity of Panama City Beach
Renovation of wooden side rails at the city pier. Replacement of all sections of worn and aged wooden side rail panels on the fields pier. There are approximately 220 panels. Furnish labor and materials to replace wooden side rail panels on the pier. Furnish and install 2”x8”x14’ top rail using composite board in the color - Cape Cod Grey. Furnish and install 2”x6”x14’ pressure treated wood side boards at top and bottom. Furnish and install 2”x2”x37.5” square spindles. Furnish and install ½” concrete anchors where spindles attach to concrete or ½” lag bolts to 6”x6” wood posts. 3 anchors per attachment point. Furnish and install 6”x6”x66” pressure treated square wooden posts. Furnish and install ¾” x6” concrete anchors to secure posts to concrete pier. 3 anchors per post. All hardware must be stainless steel. All ½”, ¾” bolts and lag bolts will have stainless steel washers. All pressure treated wood and or composite material will be secured with decking screws-no nails. Furnish and install Thompson Water Seal (or equivalent) to all wooden components.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
City of Panama City Beach
Close: Dec 18, 2025
Renovation of wooden side rails at the city pier. Replacement of all sections of worn and aged wooden side rail panels on the fields pier. There are approximately 220 panels. Furnish labor and materials to replace wooden side rail panels on the pier. Furnish and install 2”x8”x14’ top rail using composite board in the color - Cape Cod Grey. Furnish and install 2”x6”x14’ pressure treated wood side boards at top and bottom. Furnish and install 2”x2”x37.5” square spindles. Furnish and install ½” concrete anchors where spindles attach to concrete or ½” lag bolts to 6”x6” wood posts. 3 anchors per attachment point. Furnish and install 6”x6”x66” pressure treated square wooden posts. Furnish and install ¾” x6” concrete anchors to secure posts to concrete pier. 3 anchors per post. All hardware must be stainless steel. All ½”, ¾” bolts and lag bolts will have stainless steel washers. All pressure treated wood and or composite material will be secured with decking screws-no nails. Furnish and install Thompson Water Seal (or equivalent) to all wooden components.
AvailableTroop Support's Construction & Equipment
Provide frame,hoist. NSN 3950014774994. Qty 2 UI EA.
Posted Date
Nov 13, 2025
Due Date
Nov 24, 2025
Release: Nov 13, 2025
Troop Support's Construction & Equipment
Close: Nov 24, 2025
Provide frame,hoist. NSN 3950014774994. Qty 2 UI EA.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis