Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide removal of the existing 50' clear span bridge structure (steel beams, precast concrete deck, on failing wooden abutments) and replacement with 66' clear span bridge structure (steel beams, precast concrete deck, on cast-in-place concrete abutments). The new bridge will have a low chord about 2' higher than the previous bridge as well, which allows for greater flood capacity. Reed Road, which is a gravel road, will be regraded within +/- 200' of the bridge to blend in this raised height. Stream restoration will be required for this project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes replacement of the wiler road bridge with a new buried precast concrete structure.
Posted Date
Nov 14, 2025
Due Date
Jan 7, 2026
Release: Nov 14, 2025
Close: Jan 7, 2026
Work includes replacement of the wiler road bridge with a new buried precast concrete structure.
AvailableRelease: Dec 10, 2025
Close: Jan 6, 2026
Bridge replacement project.
AvailableProvide surveying services for the ellis road bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Provide surveying services for the ellis road bridge replacement project.
AvailableClose: Dec 15, 2025
Demolition and replacement of bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis