Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Runway 12/30 mill & overlay: mobilization 1 LS; low profile barricades 40 EA; contractor staking 1 LS; runway closure crosses 2 set; type 12. 5 wearing course mix (3,B) 6000 ton; remove concrete pipe storm sewer 80 LF: saw bituminous pavement 340 LF: remove bituminous pavement 3529 SY; mill bituminous surface (2") 44450 SY; common excavation (P) 3000 SY; subgrade excavation (EV) 300 CY; common borrow (CV) 300 CY; temporary pavement markings, white 20183 sf; pavement markings, white 20183 SF; pavement markings, yellow 266 sf; runway pavement grooving 35560 SY; seed mixture 25-131 4.6 acre; fertilizer, type 3 4.6 acre; topsoil respread 4.6 acre; hydraulic mulch matrix 4.6 acre. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Runway 18L-36R Rehabilitation.
Posted Date
Nov 18, 2025
Due Date
Jan 6, 2026
Release: Nov 18, 2025
Close: Jan 6, 2026
Runway 18L-36R Rehabilitation.
AvailableRedwood Falls Community Center and School Roof Replacement.
Posted Date
Dec 4, 2025
Due Date
Jan 12, 2026
Release: Dec 4, 2025
Close: Jan 12, 2026
Redwood Falls Community Center and School Roof Replacement.
AvailableDallas Fort Worth International Airport is soliciting bids for the rehabilitation of Runway 18L-36R under a unit price construction contract. The independent estimate is approximately $171.4 million with a Small Business Enterprise goal of 20% for construction services, and the total contract duration is 477 calendar days under ROCIP. The scope includes extensive airfield construction elements and associated requirements as specified in the IFB documents and addenda.
Posted Date
Nov 20, 2025
Due Date
Jan 6, 2026
Release: Nov 20, 2025
Close: Jan 6, 2026
Dallas Fort Worth International Airport is soliciting bids for the rehabilitation of Runway 18L-36R under a unit price construction contract. The independent estimate is approximately $171.4 million with a Small Business Enterprise goal of 20% for construction services, and the total contract duration is 477 calendar days under ROCIP. The scope includes extensive airfield construction elements and associated requirements as specified in the IFB documents and addenda.
50,000 gal. Elevated water storage tank. Interior wet rehabilitation (a)complete removal and replacement of protective coating system. Exterior rehabilitation (a)complete removal and replacement of protective coating system. (b)full curtain containment miscellaneous grinding, welding, and caulking. New tank roof vent. Remove/reinstall inlet/outlet insulation and jacket. Drill holes in balcony floor. Remove existing piping to fire station building. Repair and modify existing roof railing. Install new safety "tie-off" lugs. Remove abandoned telecom equipment. New overflow pipe screen. New city lettering/logos painted on exterior of tank. Repair concrete foundation mortar and grout. New safety climb system for all tower ladders. New LED aviation lights and post.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
50,000 gal. Elevated water storage tank. Interior wet rehabilitation (a)complete removal and replacement of protective coating system. Exterior rehabilitation (a)complete removal and replacement of protective coating system. (b)full curtain containment miscellaneous grinding, welding, and caulking. New tank roof vent. Remove/reinstall inlet/outlet insulation and jacket. Drill holes in balcony floor. Remove existing piping to fire station building. Repair and modify existing roof railing. Install new safety "tie-off" lugs. Remove abandoned telecom equipment. New overflow pipe screen. New city lettering/logos painted on exterior of tank. Repair concrete foundation mortar and grout. New safety climb system for all tower ladders. New LED aviation lights and post.