Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a solicitation for the Rebid-Jones Road Drainage Improvement Project in South Carolina seeking contractors for civil/road drainage work. The posting was published 2025-11-26 and closes 2025-12-29 at 02:00 PM EST; bid documents and contact information are accessible only to registered members on the buyer site. This is a single solicitation, not a grant, and remains open through the listed closing date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Posted Date
Sep 9, 2025
Due Date
Dec 29, 2025
Release: Sep 9, 2025
Close: Dec 29, 2025
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Delaware County is rebidding the Hoover #61 (Crabill #589) Drainage Improvement Project under O.R.C. 6131. The work includes improving surface drainage, installing subsurface drainage, and destroying existing subsurface drain tile. Bids are received via Bid Express.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
Delaware County is rebidding the Hoover #61 (Crabill #589) Drainage Improvement Project under O.R.C. 6131. The work includes improving surface drainage, installing subsurface drainage, and destroying existing subsurface drain tile. Bids are received via Bid Express.
AvailableProject consists of drainage improvement.
Posted Date
Dec 18, 2025
Due Date
Jan 2, 2026
Release: Dec 18, 2025
Close: Jan 2, 2026
Project consists of drainage improvement.
AvailableRelease: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →