Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The installation of a limited use/limited application elevator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of New Orleans issued an Invitation to Bid for safety surface installation work at Brechtel Park (re-bid), also referencing Laurence Square. The solicitation is estimated between $50,000 and $150,000 and is open to suppliers to submit bids via the City’s supplier portal. The bid was posted on 2026-01-09 and is due on 2026-02-11.
Posted Date
Jan 9, 2026
Due Date
Feb 11, 2026
Release: Jan 9, 2026
Close: Feb 11, 2026
The City of New Orleans issued an Invitation to Bid for safety surface installation work at Brechtel Park (re-bid), also referencing Laurence Square. The solicitation is estimated between $50,000 and $150,000 and is open to suppliers to submit bids via the City’s supplier portal. The bid was posted on 2026-01-09 and is due on 2026-02-11.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Posted Date
Sep 10, 2025
Due Date
Jan 29, 2026
Release: Sep 10, 2025
Close: Jan 29, 2026
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
AvailableSupply and installation of inground lift system for ½ ton pickup to 33 ton plow trucks.
Posted Date
Dec 17, 2025
Due Date
Feb 9, 2026
Release: Dec 17, 2025
Close: Feb 9, 2026
Supply and installation of inground lift system for ½ ton pickup to 33 ton plow trucks.
AvailableAir Cooled Chiller Replacement/Installation.
Posted Date
Jan 15, 2026
Due Date
Jan 26, 2026
Release: Jan 15, 2026
Close: Jan 26, 2026
Air Cooled Chiller Replacement/Installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →