Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Norwalk, CT (DPW) is inviting bids for roadway paving and sidewalk installation on Roton Avenue and Pine Point Road, from McKinley Street to Nearwater Road. The scope includes labor, materials, water main testing, maintenance and protection of traffic, incidental replacements, and site restoration. Work must be completed within 180 calendar days from Notice to Proceed, with additional schedule restrictions in the Special Notes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
AvailableWork in general shall consist of hybrid video/radar detection camera installation, furnish and install 1C CPU with advance traffic management software and currux adaptive signal module, conduit installation and cable installation in existing conduits.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
Work in general shall consist of hybrid video/radar detection camera installation, furnish and install 1C CPU with advance traffic management software and currux adaptive signal module, conduit installation and cable installation in existing conduits.
AvailableThis project primarily consists of sidewalk installation includes 2,380 CY unclassified roadway excavation, 781 SF furnish & install bridge sidewalk, 539 SY furnish & install concrete pavement (joint reinforced) 7", 1,941 SF furnish & install retaining wall, 68 LF furnish & install 8" PVC waterline and connection to existing line, 28 LF furnish and install reinforced concrete pipe CL III 24".
Posted Date
Jan 4, 2026
Due Date
Jan 29, 2026
Release: Jan 4, 2026
Close: Jan 29, 2026
This project primarily consists of sidewalk installation includes 2,380 CY unclassified roadway excavation, 781 SF furnish & install bridge sidewalk, 539 SY furnish & install concrete pavement (joint reinforced) 7", 1,941 SF furnish & install retaining wall, 68 LF furnish & install 8" PVC waterline and connection to existing line, 28 LF furnish and install reinforced concrete pipe CL III 24".
Work include road paving.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Work include road paving.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis