Retrieving RFP details
Release
Close
Town of Duck
Project consists of: installation of erosion and sediment control devices; selective demolition of existing driveway entrances, pavement, and vegetation; fill, earthwork, and paving for concrete and asphalt drives; concrete curbs; installation of signage; installation of stormwater permeable paver system, swales, and a bioretention system.
OTR-1025-ClassAd-2054932-1
City of Lathrop
Construction of Improvement to City Park. Improvements consist of construction of a bandstand and prefabricated shelter, new prefabricated restroom facility, PCC repair to existing pavement, 114 SY of new 4” PCC Sidewalk, and 338 SY of new 5” PCC Pavement. Project also includes the application 5,800 SF of a 1” HMA Overlay to the existing Court surfacing followed by an acrylic surfacing as well as installation of 2 new basketball goals, three pickleball netting systems, six park benches, and 60 LF of 6' high chain link fence.
Braden Development Corp
Cordova Hills Town Center Village Phase 1A Improvements.
Sumter County Soil Conservation District
Furnishing all materials, equipment, and labor necessary to construct the pinnacle court drainage improvements phase 2a & 2b consisting approx 1,640 LF of new RCP storm drainage and 16 drainage boxes, and miscellaneous demolition, utility relocation, and fine grading to facilitate the project.
Release
Sep 21, 2025
Close
Nov 18, 2025