Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kentucky Transportation Cabinet
Security controls repair/upgrade.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kentucky Transportation Cabinet
The Project will upgrade the secured door access control system in Roederer Correctional Complex Unit 1, ID, Tower A. The work of the Project involves removal of existing secured door access control system components and upgrade of the head end, monitoring location control stations, and interconnections of the control stations to the doors and gates. Upgraded system components at select doors and head end will include (but not limited to) door hardware, associated raceways, wiring and programs for a fully operational secured door access control system. Scope also includes replacement and/or upgrade of door hardware and frames for five doors as indicated on architectural documents.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
Kentucky Transportation Cabinet
Close: Nov 20, 2025
The Project will upgrade the secured door access control system in Roederer Correctional Complex Unit 1, ID, Tower A. The work of the Project involves removal of existing secured door access control system components and upgrade of the head end, monitoring location control stations, and interconnections of the control stations to the doors and gates. Upgraded system components at select doors and head end will include (but not limited to) door hardware, associated raceways, wiring and programs for a fully operational secured door access control system. Scope also includes replacement and/or upgrade of door hardware and frames for five doors as indicated on architectural documents.
AvailableDepartment of Veterans Affairs Regional Offices
Provide upgrade station chilled water for P&ID. Construct and install a new type of chiller and Air-Handling Unit (AHU) for the Upgrade Station Chilled Water P&ID 6 East project. The project involves the installation of a new dedicated air-cooled chiller system to serve the existing AC-1 unit on the 8th floor, supporting the newly renovated oncology pharmacy, and the new AHU-1 on the 6th floor, which will serve the IV prep room while maintaining RH 50% and meeting the required ventilation codes.
Posted Date
Nov 6, 2025
Due Date
Nov 18, 2025
Release: Nov 6, 2025
Department of Veterans Affairs Regional Offices
Close: Nov 18, 2025
Provide upgrade station chilled water for P&ID. Construct and install a new type of chiller and Air-Handling Unit (AHU) for the Upgrade Station Chilled Water P&ID 6 East project. The project involves the installation of a new dedicated air-cooled chiller system to serve the existing AC-1 unit on the 8th floor, supporting the newly renovated oncology pharmacy, and the new AHU-1 on the 6th floor, which will serve the IV prep room while maintaining RH 50% and meeting the required ventilation codes.
RPO EAST (36C24E)
Chiller capacity and controls upgrade.
Posted Date
Nov 13, 2025
Due Date
Dec 30, 2025
Release: Nov 13, 2025
RPO EAST (36C24E)
Close: Dec 30, 2025
Chiller capacity and controls upgrade.
Available631-Leeds (00631)
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Jan 21, 2026
Release: Oct 28, 2025
631-Leeds (00631)
Close: Jan 21, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis