Summary
Work includes 7,000 SY site preparation and earthwork; 1,500 ton imported amended soil; 400 LF 8" concrete curb; 50 LF 18" concrete curb; 250 LF concrete curb and gutter; 60 ton asphalt pavement; 600 SF decorative block retaining wall; 7 EA sidewalk drainage culverts; 80 TON gravel mulch; 1 EA 18" diameter metal flared end section; 4 EA removal pipe bollards; 1 LS reinforced concrete steps and pedestrian railing; 1 LS pavement markings; 3 EA umbrella shade structures; 3 EA bike rack bollards; 1 LS modify existing bollard and steel pipe fence; 1 EA remove and relocate existing concrete monument. See attached file.