Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Engineering design and consulting services for two segments. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Durham (General Services Department) is soliciting Construction Manager at Risk (CMAR) services for preconstruction and construction of the Durham Rail Trail Project, a roughly $45M project connecting east Durham to downtown and supported by state and federal grants. The CMAR will provide preconstruction services, cost and schedule control, and manage construction through GMP; construction is expected Jan 2027–Jun 2028.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Durham (General Services Department) is soliciting Construction Manager at Risk (CMAR) services for preconstruction and construction of the Durham Rail Trail Project, a roughly $45M project connecting east Durham to downtown and supported by state and federal grants. The CMAR will provide preconstruction services, cost and schedule control, and manage construction through GMP; construction is expected Jan 2027–Jun 2028.
Procurement of design-build services for the Walnut Grove Trail Reroute, including the construction of a 2,010-foot long, 8-foot wide concrete trail and an 8-foot wide, 60-foot long timber footbridge across Pettit Creek.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
Procurement of design-build services for the Walnut Grove Trail Reroute, including the construction of a 2,010-foot long, 8-foot wide concrete trail and an 8-foot wide, 60-foot long timber footbridge across Pettit Creek.
AvailableHorry County is soliciting a qualified, licensed firm to provide planning and design services for a Master Trail Plan for the Conway to Myrtle Beach multi-use path. The selected firm will develop a comprehensive trail master plan and is expected to have experience in trail planning, design, and knowledge of local regulations and permitting requirements. Project documents are hosted via the buyer’s project details link (BidNet Direct) and require vendor access for downloads.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Horry County is soliciting a qualified, licensed firm to provide planning and design services for a Master Trail Plan for the Conway to Myrtle Beach multi-use path. The selected firm will develop a comprehensive trail master plan and is expected to have experience in trail planning, design, and knowledge of local regulations and permitting requirements. Project documents are hosted via the buyer’s project details link (BidNet Direct) and require vendor access for downloads.
AvailableDESIGN/BUILD: Design and construct the trail reroute behind the Water Treatment Plant. The project is to include 8' wide, 5' thick concrete trail with approximately 2,010 FT long, along with a footbridge. Trail will maintain a 75 FT buffer from the creek. Footbridge will consist of 60' x 8' wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
DESIGN/BUILD: Design and construct the trail reroute behind the Water Treatment Plant. The project is to include 8' wide, 5' thick concrete trail with approximately 2,010 FT long, along with a footbridge. Trail will maintain a 75 FT buffer from the creek. Footbridge will consist of 60' x 8' wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →