Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes but is not limited to: prep, patch and paint interior walls and interior hollow metal doors and frames in the entire school. Existing room and wayfinding signage to be removed and new room and wayfinding signage to be installed. Existing base to be ripped off and replaced by CCSD flooring contractor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Renovation to the existing al ae automotive welding lab & paint booth in building b. Work includes the renovation of existing spaces at the nvcc alexandria campus.
Posted Date
Nov 5, 2025
Due Date
Dec 15, 2025
Release: Nov 5, 2025
Close: Dec 15, 2025
Renovation to the existing al ae automotive welding lab & paint booth in building b. Work includes the renovation of existing spaces at the nvcc alexandria campus.
AvailablePremium
Access the largest public sector contact database
1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Available1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Available2026 purchase and delivery of 6,000 (24 - 250 gallon totes or two full truckloads) to 9,000 gallons (36 - 250 gallon totes or three full truckloads) of high durability, high-yield pavement marking paint.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
2026 purchase and delivery of 6,000 (24 - 250 gallon totes or two full truckloads) to 9,000 gallons (36 - 250 gallon totes or three full truckloads) of high durability, high-yield pavement marking paint.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis