Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Long Beach seeks bids for the R-7252 1st Street Pedestrian Improvements project to remove existing hardscape, trees, and landscaping and install new pedestrian improvements across approximately 0.3 acres over three city blocks. The solicitation requires a mandatory pre-bid conference and site visit, includes plans/specifications and addenda, and is open with documents attached on the buyer portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Premium
Access the largest public sector contact database
Release: Oct 30, 2025
Close: Dec 18, 2025
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
AvailablePedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailablePedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailablePedestrian and bicycle improvements project. The work involves pavement rehabilitation using a warm mix asphalt overlay, installation of bicycle lanes, sidewalk reconstruction, curb installation, and drainage improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Pedestrian and bicycle improvements project. The work involves pavement rehabilitation using a warm mix asphalt overlay, installation of bicycle lanes, sidewalk reconstruction, curb installation, and drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis