Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Small structure pipe lining - culvert.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This is an Invitation for Bids for storm drain pipe lining work posted via the Utah Public Procurement Place (U3P) Bonfire portal. The solicitation solicits contractors to provide pipe-lining/rehabilitation services for storm drainage infrastructure and is not a grant. The posting was listed as open with submissions due January 29, 2026, indicating the opportunity is active as of 2026-01-15.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
This is an Invitation for Bids for storm drain pipe lining work posted via the Utah Public Procurement Place (U3P) Bonfire portal. The solicitation solicits contractors to provide pipe-lining/rehabilitation services for storm drainage infrastructure and is not a grant. The posting was listed as open with submissions due January 29, 2026, indicating the opportunity is active as of 2026-01-15.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: right-of-way marker, 4 EA; riprap, class 1, 38TN; mulched seeding, Type R, 600 SY; cored hole in concrete, 12 EA; patching concrete structures, 9 SF; structural steel, 870 lbs; repair existing structure, 1 LS; epoxy injection, epoxy injection adhesive, 12 GAL; epoxy injection, crack preparation, 40 LF; construction sign, Type A, 14 EA; stormwater management implementation, 1 LS.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: right-of-way marker, 4 EA; riprap, class 1, 38TN; mulched seeding, Type R, 600 SY; cored hole in concrete, 12 EA; patching concrete structures, 9 SF; structural steel, 870 lbs; repair existing structure, 1 LS; epoxy injection, epoxy injection adhesive, 12 GAL; epoxy injection, crack preparation, 40 LF; construction sign, Type A, 14 EA; stormwater management implementation, 1 LS.
AvailableProvide job order contracting (joc) services for stormwater pipe lining and video inspection services.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
Provide job order contracting (joc) services for stormwater pipe lining and video inspection services.
AvailableThe City of South Jordan seeks a qualified contractor to install UV-cured CIPP storm drain pipe lining at multiple city locations, with an alternative bid for geopolymer spray lining on one segment. Work includes mobilization/demobilization, traffic control, and provision of all labor, materials, equipment, and permits; the contract requires 5% bid security and bids are submitted via Bonfire. The period of performance requires substantial completion within 60 days from Notice to Proceed, with an anticipated NTP of March 1, 2026.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
The City of South Jordan seeks a qualified contractor to install UV-cured CIPP storm drain pipe lining at multiple city locations, with an alternative bid for geopolymer spray lining on one segment. Work includes mobilization/demobilization, traffic control, and provision of all labor, materials, equipment, and permits; the contract requires 5% bid security and bids are submitted via Bonfire. The period of performance requires substantial completion within 60 days from Notice to Proceed, with an anticipated NTP of March 1, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →