Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fort Worth issued an Invitation to Bid (ITB) for Sanitary Sewer Rehabilitation Contract 124 covering waterline replacement, sanitary sewer replacement (primarily by pipe bursting), and asphalt street replacement. The opportunity is posted on the City of Fort Worth Bonfire portal with supporting documents listed (Spec Book, Plans, Bid Proposal Workbook, Small Business Utilization Form) accessible through the portal. The solicitation is open (not a grant), includes a virtual pre-bid conference, and requires an Intent to Bid by the close date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water and sanitary sewer replacements. 11,686 lf 8" pvc water pipe; 90 lf 6" pvc water pipe; 14 ea fire hydrant; 23 ea connection to existing 4"-12" water main; 341 ea 1" water service, meter reconnection; 341 ea 1" water service; 2 ea 6" gate valve w/ concrete collar; 37 ea 8" gate valve w/ concrete collar; 19 cy water line grouting; 8 ea 4"-12" water abandonment plug; 9 ea salvage 4" water valve; 21 ea salvage 6" water valve; 2 ea salvage 8" water valve; 4 ea remove water cross; 10 ea salvage fire hydrant; 341 ea salvage water meter; 9 ea 8" waterline lowering; 23 ea exploratory excavation of existing utilities; temporary water services; 1,780 cy imported embedment/backfill, select fill. See outside link.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Close:
Premium
Access the largest public sector contact database
Water and sanitary sewer replacements. 11,686 lf 8" pvc water pipe; 90 lf 6" pvc water pipe; 14 ea fire hydrant; 23 ea connection to existing 4"-12" water main; 341 ea 1" water service, meter reconnection; 341 ea 1" water service; 2 ea 6" gate valve w/ concrete collar; 37 ea 8" gate valve w/ concrete collar; 19 cy water line grouting; 8 ea 4"-12" water abandonment plug; 9 ea salvage 4" water valve; 21 ea salvage 6" water valve; 2 ea salvage 8" water valve; 4 ea remove water cross; 10 ea salvage fire hydrant; 341 ea salvage water meter; 9 ea 8" waterline lowering; 23 ea exploratory excavation of existing utilities; temporary water services; 1,780 cy imported embedment/backfill, select fill. See outside link.
AvailableThe City of Hampton issued ITB 26-19TM Coliseum Sewer Re-route seeking a contractor to re-route the sanitary sewer system on Coliseum Drive. The solicitation is an Invitation for Bid open from 2025-11-14 to 2025-12-17 and directs bidders to the buyer portal for attached documentation.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
The City of Hampton issued ITB 26-19TM Coliseum Sewer Re-route seeking a contractor to re-route the sanitary sewer system on Coliseum Drive. The solicitation is an Invitation for Bid open from 2025-11-14 to 2025-12-17 and directs bidders to the buyer portal for attached documentation.
AvailableProject generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
AvailableCity of Fort Worth invites bids for PW 2018 Bond Railroad Trinity Railway Express at Riverside Drive Safety Improvements, CPN 104004. The ITB covers paving, sidewalk, curb ramp, signing, and striping work to enhance safety at the Riverside Drive railroad crossing, with bids due January 8, 2026 at 2:00 PM CST.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
City of Fort Worth invites bids for PW 2018 Bond Railroad Trinity Railway Express at Riverside Drive Safety Improvements, CPN 104004. The ITB covers paving, sidewalk, curb ramp, signing, and striping work to enhance safety at the Riverside Drive railroad crossing, with bids due January 8, 2026 at 2:00 PM CST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis