Summary
The City of Avondale Public Works Department is seeking a qualified General Engineering or KA Dual Engineering Licensed Contractor to perform rehabilitation work at the Well 7 site, including installation of an emergency generator, electrical equipment upgrades, piping modifications, undergrounding of overhead electrical service, a communication pole and conduits, and the construction of an 8-foot CMU security wall with wrought iron gate along El Mirage Road. The project also includes replacement of approximately 333 linear feet of existing 12-inch ductile iron pipe with a new 16-inch DIP water transmission main along El Mirage Road, with an alternative bid for approximately 1,357 linear feet of new 12-inch DIP along Indian School Road. Bids must encompass the entire project (Plans, Specifications, and Reference Documents) and were due July 9, 2026 at 5:00 PM Arizona Time.