Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the removal of existing flat membrane roofing on four (3) pump station buildings and the installation of epdm roofing. This includes, but is not limited to, the removal and replacement of existing roof including all flashing, aluminum trims, drip edges, protective underlayment, valley, ice guard, boots for all penetrations, clean up, and removal of all debris.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Premium
Access the largest public sector contact database
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableMcDuffie County seeks a qualified contractor to remove existing EPDM roofing and replace it with a TPO membrane roof per the solicitation scope (Section III). ITB requires sealed hard‑copy submission to County Finance, contractor qualifications, compliance with Georgia Security & Immigration Act, E-Verify, required insurance and bonds (5% bid bond; payment/performance bonds if applicable), and adherence to specified submittal forms and addenda acknowledgement. Contact: Brandon Burton via email for questions.
Posted Date
Nov 26, 2025
Due Date
Jan 9, 2026
Release: Nov 26, 2025
Close: Jan 9, 2026
McDuffie County seeks a qualified contractor to remove existing EPDM roofing and replace it with a TPO membrane roof per the solicitation scope (Section III). ITB requires sealed hard‑copy submission to County Finance, contractor qualifications, compliance with Georgia Security & Immigration Act, E-Verify, required insurance and bonds (5% bid bond; payment/performance bonds if applicable), and adherence to specified submittal forms and addenda acknowledgement. Contact: Brandon Burton via email for questions.
AvailableRelease: Dec 10, 2025
Close: Jan 9, 2026
Roof replacements.
AvailableRemove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 9, 2026
Release: Nov 26, 2025
Close: Jan 9, 2026
Remove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.